Skip to main content

Colleyville bathroom remodeling

Colleyville Bathroom Remodeling — Primary Suites, Custom Showers & Higher-End Finishes

Primary suite bathroom remodels for Colleyville homes — custom walk-in showers, freestanding tubs, slab stone work, built-in storage, and finish carpentry coordinated under one roof.

Colleyville bathroom projects tend to start at a higher finish level than average — full-slab stone walls, frameless glass, freestanding tubs, and integrated millwork are standard scope rather than upgrades. Most of the primary baths we remodel are large rooms that need a layout rework, not just new surfaces.

Custom showers, vanity design, storage detailing, lighting plans, and finish carpentry all run through Regent's design and build team together, which is what keeps the room reading as one designed space.

Primary suite bath upgrades

Layout reworks, freestanding tubs, double vanities, dressing areas, water closets, and heated tile floors.

Custom walk-in showers

Curbless walk-ins, frameless low-iron glass, slab stone walls, niches, body sprays, benches, and steam.

Storage & millwork

Built-in vanities, linen towers, recessed medicine cabinets, drawer banks, and in-drawer outlets sized to the room.

Higher-end finishes

Bookmatched porcelain or natural stone slabs, integrated lighting, custom tile detailing, and matched plumbing fixtures.

Layout improvements

Right-sizing water closets, removing unused tubs, expanding into closets, and improving daylight and ventilation.

Design-build process

One team, planning first, fewer handoffs.

Design and construction live under the same roof at Regent, so the person drawing your project is accountable to the person building it. You get clear communication, locked selections, and a single point of contact from consultation through final walkthrough.

  1. 01

    Consultation

    We walk the space with you, talk through how you live, and give a realistic budget range before any design fees.

  2. 02

    Design & planning

    Layout, selections, and 3D visualization so you see the result before we open a wall.

  3. 03

    Scope, selections & schedule

    Detailed line-item pricing, locked selections, and a written schedule — no surprises mid-build.

  4. 04

    Construction

    One team manages every trade, with dust containment, daily clean-up, and consistent communication.

  5. 05

    Final walkthrough

    Punch list closed, care guides handed over, and a clean turnover. One number to call after.

Working in Colleyville.

Colleyville homeowners typically expect their bathroom to perform at the same level as the rest of the house. That means the design, millwork, and trade coordination need to match — not be farmed out to three vendors who have never worked together. We do the design, the build, and the finish carpentry inside the same team, with one project manager you call from start to handoff.

FAQ

Colleyville bathroom remodeling questions.

What does a Colleyville primary bath remodel usually include?

Most Colleyville primary baths we build include a custom walk-in shower with full-slab or full-height tile, a freestanding tub on its own slab, a double vanity with built-in storage and stone counters, a private water closet, and integrated millwork like linen towers or dressing-area built-ins. Layout changes are common.

Do you do higher-end finishes — slab stone walls, frameless glass, freestanding tubs?

Yes — that's the default finish level for most of our Colleyville bathroom projects. Bookmatched porcelain or natural stone slab walls, low-iron frameless glass, freestanding tubs on their own slabs, and integrated lighting are standard scope conversations.

How is storage typically improved in a primary bath remodel?

We design built-in vanities sized to the room (not the catalog), recessed medicine cabinets, linen towers, drawer banks instead of doors, in-drawer outlets, and integrated hampers where they fit. Storage is part of the design from the start, not added on at the end.

How long does a Colleyville bathroom remodel take?

Hall baths typically run 3–5 weeks. Primary suite baths with custom showers, layout changes, and slab stone work usually run 6–10 weeks. Stone fabrication and frameless glass templating are the most common timeline drivers — we build the lead times into the schedule.

Can you keep the rest of the house clean during construction?

Yes. Dust containment goes up at the bathroom entry, floors are protected along the work path, HEPA filtration runs when sanding or cutting, and the site is cleaned at the end of each day.

Do you handle HOA architectural reviews where they apply?

For exterior changes or anything visible from the street, yes — we prepare and submit the documentation an HOA architectural review typically requires. Most interior bathroom remodels don't trigger HOA review, but we confirm during the walkthrough.

Let's Build Your Dream Space

Tell us about your project — we'll respond within one business day.